After the September floods, Millbank asks for its river wall back

Residents want the old flood defenses rebuilt before spring. Engineers say a wider floodplain would work better.

By Hana Moreau

·

·

6 min read

A wet city street lined with trees and parked cars

Weir Lane two days after the storm. Photo: Unsplash.

Two months after the September storm, residents of Millbank want the old river wall rebuilt before the spring rains.

The water reached the ground floors of 140 homes on Weir Lane and the streets around it. The wall had been lowered in 2015 to open up views of the river.

Wall or floodplain

The city’s engineers favor a different plan. They want to give the Arle more room upstream, turning two fields into a floodplain that can hold water during storms.

“A wall moves the water to someone else’s street. A floodplain gives it somewhere to go.”

— Paul Okonkwo, city engineer

A public meeting is set for 3 December at the Millbank community center.

About the author

Hana Moreau

Climate reporter

Hana covers energy, weather and the river Arle. She trained as a hydrologist before turning to journalism.

Latest from Gazette

Create a free website with Framer, the website builder loved by startups, designers and agencies.